Mechanical Costing and Estimation:Containing Project Planning
By: Singh C K.
Contributor(s): Khan M I.
Material type:
Item type | Current location | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|
![]() |
GENERAL STACK AREA | 621.8 SIN/M (Browse shelf) | Available | 26624 | ||
![]() |
GENERAL STACK AREA | 621.8 SIN/M (Browse shelf) | Available | 27699 | ||
![]() |
GENERAL STACK AREA | 621.8 SIN/M (Browse shelf) | Available | 27700 | ||
![]() |
GENERAL STACK AREA | 621.8 SIN/M (Browse shelf) | Available | 27701 |
Total holds: 0