Project Planning and Control with Pert and CPM
By: Punmia BC.
Contributor(s): Khandelwal KK.
Material type:
Item type | Current location | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|
![]() |
GENERAL STACK AREA | 658.4032 PUN/P (Browse shelf) | Available | 29760 |
Total holds: 0